Two UP lines, 37 crossings, and a quiet zone lost to failed inspections.

Growth market

Summary

MetroAustin
RailroadsUnion Pacific
Open at-grade crossings37
Vehicles a day crossing tracks at grade252,175
Busiest crossing in the modelAquarena Springs Dr (973960L): 37,069 vehicles/day, 21 trains/day
Growth driverAustin–San Antonio corridor
Data sourceFRA Crossing Inventory, retrieved Oct 2, 2026

Blockage scenario

Time
$566K
26,383 person-hours a year
Trade
628
truck-hours a year, worth $22K in driver time
Pollution
43 t
CO₂ from 4,738 gallons idled, like 9.3 cars for a year

Example scenario. No blockage reports have been compiled for this city yet.

Blockages modeled per crossing per year156
Vehicles stopped by one blockage901
Trucks stopped by one blockage32
Person-hours lost per year26,383
Value of lost time per year$566K
Truck-hours idled per year628
Gallons of fuel idled per year4,738
CO₂ per year (metric tons)43

Screening estimate. Each selected crossing is blocked for the set time; drivers wait half of it on average. Method and sources

Crossings in the model

CrossingUSDOT IDVehicles/dayCount yearTrains/dayTrucks
973960L37,0692025213%
415507U24,7202024194%
415677N24,7202024124%

Uncheck a crossing to remove it from the scenario. "~" truck shares use the city's traffic-weighted average where the inventory reports none.

On the record

  • Trains have sounded horns since May 2024, after FRA inspections cost the city its quiet zones. 18 crossings needed minor repairs and 6 needed major ones, including Hopkins St.
    Community Impact · Mar 31, 2025 ↗
  • The Austin–Round Rock–San Marcos metro reached 2,620,945 people in 2025 (+53,796), the sixth-largest gain in the U.S.
    U.S. Census Bureau · Mar 26, 2026 ↗